Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

You can also drag issues from the list that is displayed on the left side of your plan, and drop them in the desired position on the timeline.

The By default, the list displays issues that are unscheduled, and belong to the main project of the plan. By default, there There are 20 issues displayed on the list, but you can scroll down to load more.

...